United States βΊ Grid βΊ Transmission lines βΊ Arizona
OCTARY USA Β· TRANSMISSIONArizona Power Electric Service: Transmission lines in Arizona
The high-voltage lines that carry electricity from power plants to cities, with voltage, owner and the substations at each end. Click a state to drill down, or a line on the map for details.
Map
Longest high-voltage lines
No 220 kV+ lines in this view.
Line length by state
Click a state to drill down.
Largest owners
By route length in this view. Click to map their lines.
- Arizona Public Service Company4,302 km Β· 1,125 km at 345 kV+
- Salt River Project1,428 km Β· 32.5 km at 345 kV+
- Navajo Tribal Utility Authority834 km Β· 412 km at 345 kV+
- Sulphur Springs Valley Electric Cooperative543 km
- Tucson Electric Power Company486 km Β· 22.5 km at 345 kV+
- WAPA-- Western Area Power Administration359 km Β· 359 km at 345 kV+
- Pacificorp303 km
- Southern California Edison279 km Β· 108 km at 345 kV+
- Navopache Electric Cooperative275 km Β· 35.8 km at 345 kV+
- Trico Electric Cooperative166 km
- Garkane Energy Coop, Inc152 km
- Arizona Public Service Co142 km
- San Diego Gas & Electirc130 km Β· 130 km at 345 kV+
- Graham County Electric Cooperative Incorporated109 km
- WAPA83.3 km
- Aic72.6 km
- Western Area Power Administration72.5 km
- Uns Electric Incorporated67.1 km
- Graham County Electric Cooperative Incorpor45.5 km
- Airzona Public Utility Co30.1 km
Source: Homeland Infrastructure Foundation-Level Data (HIFLD), Electric Power Transmission Lines. HIFLD Open closed in September 2025; this is the last public version (August 2025). Lines are mapped from imagery and utility filings; some voltages and owners are not reported. Lengths are route lengths of the mapped sections. Interconnection queues Β· US power plants