United States βΊ Grid βΊ Interconnection queues βΊ Indiana
ONSHORE WIND Β· PJMDog Creek Wind Farm
Dog Creek Wind Farm is a 240 MW onshore wind request withdrawn in the PJM interconnection queue, in Allen County, Indiana, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2007 (completed)
- Withdrawn / abandonedDec 2015 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- S72
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Convoy-East Lima 345kV
- Location
- Allen County, Indiana
- Technology
- Wind: 240 MW
- Total requested
- 240 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Withdrawn
- Entered queue
- 30 July 2007
- Proposed online date
- December 2016
- Withdrawn
- December 2015
Location
Marker shows the centre of Allen County; the queue data does not give exact sites.
Other requests in Allen County
- Flatrock Creek Solar IISolar Β· 100 MW Β· agreement signed
- Flatrock Creek Solar ISolar Β· 100 MW Β· agreement signed
- Tillman Solar ParkSolar Β· 100 MW Β· agreement signed
- Flatrock Creek Storage IBattery storage Β· 50.0 MW Β· agreement signed
- Battery storage project AG2-370, Allen CountyBattery storage Β· 50.0 MW Β· in study
- Solar project AI2-426, Allen CountySolar Β· 43.2 MW Β· in study
- Solar project AI2-418, Allen CountySolar Β· 24.0 MW Β· in study
- Onshore wind project S73, Allen CountyOnshore wind Β· 200 MW Β· withdrawn
- Solar project AH1-549, Allen CountySolar Β· 180 MW Β· withdrawn
- Battery storage project AH1-413, Allen CountyBattery storage Β· 100 MW Β· withdrawn
- Solar project AG1-424, Allen CountySolar Β· 100 MW Β· withdrawn
- Battery storage project AH1-301, Allen CountyBattery storage Β· 100 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem