United States β€Ί Grid β€Ί Interconnection queues β€Ί Iowa

ONSHORE WIND Β· MISO

Onshore wind project J415, Franklin County

Onshore wind project J415, Franklin County is a 200 MW onshore wind request withdrawn in the MISO interconnection queue, in Franklin County, Iowa.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2014 (completed)
  2. Withdrawn / abandonedOct 2018 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J415
Grid region
MISO (Midcontinent)
Connection point (POI)
New 345 kV Switchyard on the ROW of the proposed 345 kV Emery - Blackhawk line (MVP4)
Location
Franklin County, Iowa
Technology
Wind: 200 MW
Total requested
200 MW
Study phase
GIA
Queue status
Withdrawn
Entered queue
14 November 2014
Proposed online date
July 2019
Withdrawn
October 2018

Location

Marker shows the centre of Franklin County; the queue data does not give exact sites.

Power plants in Iowa Β· Transmission lines in Iowa

Other requests in Franklin County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem