🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › Iowa

OTHER · MISO

Replace 15 MW of ALTW.FPL_DAEC Unit with Battery; Duane Arnold

Replace 15 MW of ALTW.FPL_DAEC Unit with Battery; Duane Arnold is a 640 MW other request withdrawn in the MISO interconnection queue, in Linn County, Iowa, connecting to Alliant Energy West.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2021 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
R1012
Grid region
MISO (Midcontinent)
Utility / transmission owner
Alliant Energy West
Connection point (POI)
Duane Arnold 161 kV
Location
Linn County, Iowa
Technology
Other: 640 MW · Battery
Total requested
640 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
30 September 2021
Proposed online date
July 2023

Location

Marker shows the centre of Linn County; the queue data does not give exact sites.

Power plants in Iowa · Transmission lines in Iowa

Other requests in Linn County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem