United States β€Ί Grid β€Ί Interconnection queues β€Ί Oklahoma

ONSHORE WIND Β· SPP

Onshore wind project GEN-2011-006, Osage County

Onshore wind project GEN-2011-006, Osage County is a 200 MW onshore wind request withdrawn in the SPP interconnection queue, in Osage County, Oklahoma, connecting to AEP.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2011 (completed)
  2. Withdrawn / abandonedAug 2011 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2011-006
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
AEP
Connection point (POI)
Shidler 138kV
Location
Osage County, Oklahoma
Technology
Wind: 200 MW
Total requested
200 MW
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
29 March 2011
Proposed online date
June 2013
Withdrawn
August 2011

Location

Marker shows the centre of Osage County; the queue data does not give exact sites.

Power plants in Oklahoma Β· Transmission lines in Oklahoma

Other requests in Osage County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem