United States β€Ί Grid β€Ί Interconnection queues β€Ί Wisconsin

ONSHORE WIND Β· MISO

Onshore wind project H036, Columbia County

Onshore wind project H036, Columbia County is a 30.0 MW onshore wind request withdrawn in the MISO interconnection queue, in Columbia County, Wisconsin.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2008 (completed)
  2. Withdrawn / abandonedDec 2008 (project stopped here)
  3. ConsentedDec 2008 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
H036
Grid region
MISO (Midcontinent)
Connection point (POI)
Friesland Substation 138kV bus
Location
Columbia County, Wisconsin
Technology
Wind: 30.0 MW
Total requested
30.0 MW
Study phase
Feasibility
Queue status
Withdrawn
Entered queue
27 May 2008
Agreement signed
23 December 2008
Proposed online date
June 2011
Withdrawn
December 2008

Location

Marker shows the centre of Columbia County; the queue data does not give exact sites.

Power plants in Wisconsin Β· Transmission lines in Wisconsin

Other requests in Columbia County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem