United States β€Ί Grid β€Ί Interconnection queues β€Ί Washington

SOLAR Β· WEST

Solar project 106, Grant County

Solar project 106, Grant County is a 180 MW solar request withdrawn in the West interconnection queue, in Grant County, Washington, connecting to Avista Utilities.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2020 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
106
Grid region
West (non-ISO utilities)
Utility / transmission owner
Avista Utilities
Connection point (POI)
230kV Project #76 POI Station
Location
Grant County, Washington
Technology
Solar: 180 MW
Total requested
180 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
21 May 2020
Proposed online date
December 2022

Location

Marker shows the centre of Grant County; the queue data does not give exact sites.

Power plants in Washington Β· Transmission lines in Washington

Other requests in Grant County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem