United States › Grid › Interconnection queues › Washington

SOLAR + STORAGE · WEST

Solar + storage project G0744, Grant County

Solar + storage project G0744, Grant County is a 400 MW solar + storage request in interconnection study in the West interconnection queue, in Grant County, Washington.

Queue statusIn planning
  1. PlanningQueued May 2022 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Dec 2026 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
G0744
Grid region
West (non-ISO utilities)
Connection point (POI)
1. Vantage-Hanford #1 500 kV line 2. Corridor of the 230kV Midway- Rocky Ford and Midway-Potholes 230kV transmission lines
Location
Grant County, Washington
Technology
Solar: 200 MW · Battery: 200 MW
Total requested
400 MW
Service type
NRIS and ERIS
Study phase
In Progress (unknown study)
Queue status
Active
Entered queue
24 May 2022
Proposed online date
December 2026

Location

Marker shows the centre of Grant County; the queue data does not give exact sites.

Power plants in Washington · Transmission lines in Washington

Other requests in Grant County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem