ONSHORE WIND Β· SPPOnshore wind project GEN-2024-237, Okfuskee County
Onshore wind project GEN-2024-237, Okfuskee County is a 240 MW onshore wind request withdrawn in the SPP interconnection queue, in Okfuskee County, Oklahoma, connecting to WFEC.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2025 (completed)
- Withdrawn / abandonedDec 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2024-237
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- WFEC
- Connection point (POI)
- Paragon 138 kV Substation
- Location
- Okfuskee County, Oklahoma
- Technology
- Wind: 240 MW
- Total requested
- 240 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 1 March 2025
- Proposed online date
- December 2029
- Withdrawn
- December 2025
Location
Marker shows the centre of Okfuskee County; the queue data does not give exact sites.
Other requests in Okfuskee County
- Onshore wind project GEN-2024-236, Okfuskee CountyOnshore wind Β· 241 MW Β· in study
- Onshore wind project GEN-2023-088, Okfuskee CountyOnshore wind Β· 117 MW Β· in study
- Onshore wind project GEN-2022-085, Okfuskee CountyOnshore wind Β· 241 MW Β· withdrawn
- Onshore wind project GEN-2024-070, Okfuskee CountyOnshore wind Β· 185 MW Β· withdrawn
- Gas project GEN-2014-027, Okfuskee CountyGas Β· 60.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem