United States βΊ Grid βΊ Interconnection queues βΊ Kentucky
SOLAR Β· SOUTHEASTSolar project LGE-GIS-2019-008, Caldwell County
Solar project LGE-GIS-2019-008, Caldwell County is a 100 MW solar request withdrawn in the Southeast interconnection queue, in Caldwell County, Kentucky, connecting to Louisville Gas & Electric and Kentucky Utilities Energy.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2019 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- LGE-GIS-2019-008
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Louisville Gas & Electric and Kentucky Utilities Energy
- Connection point (POI)
- North Princeton 161 kV Substation
- Location
- Caldwell County, Kentucky
- Technology
- Solar: 100 MW
- Total requested
- 100 MW
- Service type
- Network resource (NRIS)
- Study phase
- LGIA terminated
- Queue status
- Withdrawn
- Entered queue
- 22 March 2019
- Proposed online date
- December 2021
Location
Marker shows the centre of Caldwell County; the queue data does not give exact sites.
Other requests in Caldwell County
- Battery storage project J3490, Caldwell CountyBattery storage Β· 200 MW Β· withdrawn
- Solar project J1632, Caldwell CountySolar Β· 200 MW Β· withdrawn
- Solar project J1448, Caldwell CountySolar Β· 150 MW Β· withdrawn
- Solar project LGE-GIS-2019-028, Caldwell CountySolar Β· 150 MW Β· withdrawn
- Solar project 558, Caldwell CountySolar Β· 125 MW Β· withdrawn
- Solar project LGE-GIS-2021-001, Caldwell CountySolar Β· 100 MW Β· withdrawn
- Solar project 617, Caldwell CountySolar Β· 100 MW Β· withdrawn
- Solar project LGE-GIS-2023-005, Caldwell CountySolar Β· 100 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem