United States β€Ί Grid β€Ί Interconnection queues β€Ί Kentucky

BATTERY STORAGE Β· MISO

Battery storage project J3490, Caldwell County

Battery storage project J3490, Caldwell County is a 200 MW battery storage request withdrawn in the MISO interconnection queue, in Caldwell County, Kentucky, connecting to BIG RIVERS ELECTRIC CORPORATION.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2024 (completed)
  2. Withdrawn / abandonedDec 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J3490
Grid region
MISO (Midcontinent)
Utility / transmission owner
BIG RIVERS ELECTRIC CORPORATION
Connection point (POI)
Caldwell County
Location
Caldwell County, Kentucky
Technology
Battery: 200 MW
Total requested
200 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: DPP 1
Queue status
Withdrawn
Entered queue
21 March 2024
Proposed online date
September 2027
Withdrawn
December 2025

Location

Marker shows the centre of Caldwell County; the queue data does not give exact sites.

Power plants in Kentucky Β· Transmission lines in Kentucky

Other requests in Caldwell County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem