πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

OTHER Β· ERCOT

Nickel Prairie Storage

Nickel Prairie Storage is a 209 MW other request withdrawn in the ERCOT interconnection queue, in Brazoria County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2019 (completed)
  2. Withdrawn / abandonedMay 2022 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
21INR0487
Grid region
ERCOT (Texas)
Developer
KCE TX 17, LLC
Connection point (POI)
44600 Rosharon 138kV
Location
Brazoria County, Texas
Technology
Other: 209 MW
Total requested
209 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
22 December 2019
Proposed online date
May 2023
Withdrawn
May 2022

Location

Marker shows the centre of Brazoria County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Brazoria County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem