United States βΊ Grid βΊ Interconnection queues βΊ Arizona
SOLAR + STORAGE Β· WESTSolar + storage project 111, Greenlee County
Solar + storage project 111, Greenlee County is a 230 MW solar + storage request withdrawn in the West interconnection queue, in Greenlee County, Arizona, connecting to Tucson Electric Power Company.
Queue statusWithdrawn / abandoned
- PlanningQueued Jan 2022 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 111
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- Tucson Electric Power Company
- Connection point (POI)
- Greenlee-Winchester 345kV Transmission Line
- Location
- Greenlee County, Arizona
- Technology
- Solar: 230 MW Β· Battery
- Total requested
- 230 MW
- Service type
- Network resource (NRIS)
- Queue status
- Withdrawn
- Entered queue
- 6 January 2022
- Proposed online date
- January 2024
Location
Marker shows the centre of Greenlee County; the queue data does not give exact sites.
Other requests in Greenlee County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem