United States β€Ί Grid β€Ί Interconnection queues β€Ί Arizona

SOLAR + STORAGE Β· WEST

Solar + storage project Q2404, Navajo County

Solar + storage project Q2404, Navajo County is a 2,519 MW solar + storage request withdrawn in the West interconnection queue, in Navajo County, Arizona, connecting to Salt River Project.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2024 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
Q2404
Grid region
West (non-ISO utilities)
Utility / transmission owner
Salt River Project
Connection point (POI)
Silver King-Coronado 500 kV Line
Location
Navajo County, Arizona
Technology
Solar: 1,130 MW Β· Battery: 1,389 MW
Total requested
2,519 MW
Queue status
Withdrawn
Entered queue
5 February 2024
Proposed online date
December 2028

Location

Marker shows the centre of Navajo County; the queue data does not give exact sites.

Power plants in Arizona Β· Transmission lines in Arizona

Other requests in Navajo County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem