United States βΊ Grid βΊ Interconnection queues βΊ Texas
ONSHORE WIND Β· SPPOnshore wind project GEN-2009-017, Reagan County
Onshore wind project GEN-2009-017, Reagan County is a 60.0 MW onshore wind request withdrawn in the SPP interconnection queue, in Reagan County, Texas, connecting to SPS.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2009 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2009-017
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- SPS
- Connection point (POI)
- TAP PEMBROOK-STILES 138kV
- Location
- Reagan County, Texas
- Technology
- Wind: 60.0 MW
- Total requested
- 60.0 MW
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 1 April 2009
- Proposed online date
- June 2011
Location
Marker shows the centre of Reagan County; the queue data does not give exact sites.
Other requests in Reagan County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem