United States βΊ Grid βΊ Interconnection queues βΊ Nebraska
ONSHORE WIND Β· SPPOnshore wind project GEN-2007-010N01, Gage County
Onshore wind project GEN-2007-010N01, Gage County is a 100 MW onshore wind request withdrawn in the SPP interconnection queue, in Gage County, Nebraska, connecting to NPPD.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2007 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2007-010N01
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- NPPD
- Location
- Gage County, Nebraska
- Technology
- Wind: 100 MW
- Total requested
- 100 MW
- Service type
- Energy only (ERIS)
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 1 March 2007
Location
Marker shows the centre of Gage County; the queue data does not give exact sites.
Other requests in Gage County
- Gas project GEN-2023-222, Gage CountyGas Β· 478 MW Β· in study
- Gas project GEN-2024-022, Gage CountyGas Β· 390 MW Β· in study
- Gas project GEN-2024-023, Gage CountyGas Β· 270 MW Β· in study
- Gas project GEN-2023-223, Gage CountyGas Β· 239 MW Β· in study
- Gas project GEN-2024-019, Gage CountyGas Β· 62.0 MW Β· in study
- Gas project GEN-2024-018, Gage CountyGas Β· 31.0 MW Β· in study
- Gas project GEN-2001-029N, Gage CountyGas Β· 250 MW Β· built
- Onshore wind project GEN-2022-039, Gage CountyOnshore wind Β· 185 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem