United States › Grid › Interconnection queues › Mississippi
SOLAR · MISOSolar project J3049, Madison County
Solar project J3049, Madison County is a 188 MW solar request in interconnection study in the MISO interconnection queue, in Madison County, Mississippi, connecting to ENTERGY MISSISSIPPI, LLC..
- PlanningQueued Sep 2022 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2024 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- J3049
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ENTERGY MISSISSIPPI, LLC.
- Connection point (POI)
- LAKEOVER EHV - MCADAMS EHV 500.0kV
- Location
- Madison County, Mississippi
- Technology
- Solar: 188 MW
- Total requested
- 188 MW
- Service type
- Energy only (ERIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Active
- Entered queue
- 15 September 2022
- Proposed online date
- December 2024
Location
Marker shows the centre of Madison County; the queue data does not give exact sites.
Power plants in Mississippi · Transmission lines in Mississippi
Other requests in Madison County
- Solar project J1747, Madison CountySolar · 50.0 MW · under construction
- Battery storage project J4154, Madison CountyBattery storage · 200 MW · in study
- Solar + storage project J3764, Madison CountySolar + storage · 170 MW · in study
- Solar project J3053, Madison CountySolar · 169 MW · in study
- Battery storage project J3093, Madison CountyBattery storage · 100 MW · in study
- Solar project J830, Madison CountySolar · 100 MW · built
- Solar project J2406, Madison CountySolar · 200 MW · withdrawn
- Solar project J3855, Madison CountySolar · 198 MW · withdrawn
- Solar project J2612, Madison CountySolar · 150 MW · withdrawn
- Solar project J1630, Madison CountySolar · 150 MW · withdrawn
- Solar project J2358, Madison CountySolar · 114 MW · withdrawn
- Solar project J585, Madison CountySolar · 100 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem