Solar project J2406, Madison County is a 200 MW solar request withdrawn in the MISO interconnection queue, in Madison County, Mississippi, connecting to ENTERGY MISSISSIPPI, LLC..
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2022 (completed)
- Withdrawn / abandonedJul 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J2406
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ENTERGY MISSISSIPPI, LLC.
- Connection point (POI)
- Pickens - Canton 230 kV
- Location
- Madison County, Mississippi
- Technology
- Solar: 200 MW
- Total requested
- 200 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 14 September 2022
- Proposed online date
- September 2026
- Withdrawn
- July 2025
Location
Marker shows the centre of Madison County; the queue data does not give exact sites.
Power plants in Mississippi Β· Transmission lines in Mississippi
Other requests in Madison County
- Solar project J1747, Madison CountySolar Β· 50.0 MW Β· under construction
- Battery storage project J4154, Madison CountyBattery storage Β· 200 MW Β· in study
- Solar project J3049, Madison CountySolar Β· 188 MW Β· in study
- Solar + storage project J3764, Madison CountySolar + storage Β· 170 MW Β· in study
- Solar project J3053, Madison CountySolar Β· 169 MW Β· in study
- Battery storage project J3093, Madison CountyBattery storage Β· 100 MW Β· in study
- Solar project J830, Madison CountySolar Β· 100 MW Β· built
- Solar project J3855, Madison CountySolar Β· 198 MW Β· withdrawn
- Solar project J2612, Madison CountySolar Β· 150 MW Β· withdrawn
- Solar project J1630, Madison CountySolar Β· 150 MW Β· withdrawn
- Solar project J2358, Madison CountySolar Β· 114 MW Β· withdrawn
- Solar project J585, Madison CountySolar Β· 100 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem