United States βΊ Grid βΊ Interconnection queues βΊ Minnesota
SOLAR Β· MISOSolar project J3278, Swift County
Solar project J3278, Swift County is a 90.0 MW solar request withdrawn in the MISO interconnection queue, in Swift County, Minnesota, connecting to GREAT RIVER ENERGY.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2024 (completed)
- Withdrawn / abandonedDec 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J3278
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- GREAT RIVER ENERGY
- Connection point (POI)
- SWENODA TAP - DUBLIN TAP - SS360 - 360WSM1 115.0kV
- Location
- Swift County, Minnesota
- Technology
- Solar: 90.0 MW
- Total requested
- 90.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 1
- Queue status
- Withdrawn
- Entered queue
- 16 April 2024
- Proposed online date
- August 2028
- Withdrawn
- December 2025
Location
Marker shows the centre of Swift County; the queue data does not give exact sites.
Power plants in Minnesota Β· Transmission lines in Minnesota
Other requests in Swift County
- Onshore wind project J3886, Swift CountyOnshore wind Β· 300 MW Β· in study
- Other project G034, Swift CountyOther Β· 55.0 MW Β· built
- Other project J171, Swift CountyOther Β· 7.0 MW Β· built
- Onshore wind project G932, Swift CountyOnshore wind Β· 56.0 MW Β· withdrawn
- Onshore wind project G782, Swift CountyOnshore wind Β· 42.0 MW Β· withdrawn
- Onshore wind project G636, Swift CountyOnshore wind Β· 18.9 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem