United States βΊ Grid βΊ Interconnection queues βΊ Minnesota
ONSHORE WIND Β· MISOOnshore wind project G932, Swift County
Onshore wind project G932, Swift County is a 56.0 MW onshore wind request withdrawn in the MISO interconnection queue, in Swift County, Minnesota.
Queue statusWithdrawn / abandoned
- PlanningQueued Dec 2007 (completed)
- Withdrawn / abandonedOct 2008 (project stopped here)
- ConsentedOct 2008 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G932
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- GRE transmission line at the 69 kV rating
- Location
- Swift County, Minnesota
- Technology
- Wind: 56.0 MW
- Total requested
- 56.0 MW
- Study phase
- Feasibility
- Queue status
- Withdrawn
- Entered queue
- 11 December 2007
- Agreement signed
- 31 October 2008
- Proposed online date
- January 2012
- Withdrawn
- October 2008
Location
Marker shows the centre of Swift County; the queue data does not give exact sites.
Power plants in Minnesota Β· Transmission lines in Minnesota
Other requests in Swift County
- Onshore wind project J3886, Swift CountyOnshore wind Β· 300 MW Β· in study
- Other project G034, Swift CountyOther Β· 55.0 MW Β· built
- Other project J171, Swift CountyOther Β· 7.0 MW Β· built
- Solar project J3278, Swift CountySolar Β· 90.0 MW Β· withdrawn
- Onshore wind project G782, Swift CountyOnshore wind Β· 42.0 MW Β· withdrawn
- Onshore wind project G636, Swift CountyOnshore wind Β· 18.9 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem