Onshore wind project G932, Swift County

Onshore wind project G932, Swift County is a 56.0 MW onshore wind request withdrawn in the MISO interconnection queue, in Swift County, Minnesota.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2007 (completed)
  2. Withdrawn / abandonedOct 2008 (project stopped here)
  3. ConsentedOct 2008 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G932
Grid region
MISO (Midcontinent)
Connection point (POI)
GRE transmission line at the 69 kV rating
Location
Swift County, Minnesota
Technology
Wind: 56.0 MW
Total requested
56.0 MW
Study phase
Feasibility
Queue status
Withdrawn
Entered queue
11 December 2007
Agreement signed
31 October 2008
Proposed online date
January 2012
Withdrawn
October 2008

Location

Marker shows the centre of Swift County; the queue data does not give exact sites.

Power plants in Minnesota Β· Transmission lines in Minnesota

Other requests in Swift County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem