United States βΊ Grid βΊ Interconnection queues βΊ Georgia
SOLAR + STORAGE Β· SOUTHEASTSolar + storage project IC-1016, Bibb County
Solar + storage project IC-1016, Bibb County is a 80.0 MW solar + storage request withdrawn in the Southeast interconnection queue, in Bibb County, Georgia, connecting to Southern Company.
Queue statusWithdrawn / abandoned
- PlanningQueued Jan 2022 (completed)
- Withdrawn / abandonedJul 2022 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- IC-1016
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Southern Company
- Connection point (POI)
- Dorsett - Forest Road 115 kV Line
- Location
- Bibb County, Georgia
- Technology
- Solar: 80.0 MW Β· Battery
- Total requested
- 80.0 MW
- Service type
- NRIS and ERIS
- Study phase
- Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 28 January 2022
- Withdrawn
- July 2022
Location
Marker shows the centre of Bibb County; the queue data does not give exact sites.
Other requests in Bibb County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem