United States › Grid › Interconnection queues › New York

BATTERY STORAGE · NYISO

Shoemaker Energy Storage

Shoemaker Energy Storage is a 5.5 MW battery storage request withdrawn in the NYISO interconnection queue, in Orange County, New York, connecting to O&R.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2021 (completed)
  2. Withdrawn / abandonedNov 2021 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1253
Grid region
NYISO (New York)
Utility / transmission owner
O&R
Developer
Alliance Energy Storage, LLC
Connection point (POI)
Shoemaker
Location
Orange County, New York
Technology
Battery: 5.5 MW
Total requested
5.5 MW
Queue status
Withdrawn
Entered queue
15 September 2021
Withdrawn
November 2021

Location

Marker shows the centre of Orange County; the queue data does not give exact sites.

Power plants in New York · Transmission lines in New York

Other requests in Orange County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem