BATTERY STORAGE · NYISOPoplar Energy Center, LLC
Poplar Energy Center, LLC is a 60.0 MW battery storage request withdrawn in the NYISO interconnection queue, in Suffolk County, New York, connecting to LIPA.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2024 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- C24-218
- Grid region
- NYISO (New York)
- Utility / transmission owner
- LIPA
- Developer
- Poplar Energy Center
- Connection point (POI)
- Riverhead - Tuthill 69kV
- Location
- Suffolk County, New York
- Technology
- Battery: 60.0 MW
- Total requested
- 60.0 MW
- Queue status
- Withdrawn
- Entered queue
- 20 September 2024
Location
Marker shows the centre of Suffolk County; the queue data does not give exact sites.
Other requests in Suffolk County
- Sunrise WindOffshore wind · 880 MW · in study
- East Setauket Storage IIBattery storage · 248 MW · in study
- Kce NY 37Battery storage · 150 MW · in study
- Ramadi Utility StorageBattery storage · 140 MW · in study
- Marathon BESSBattery storage · 135 MW · in study
- East Setauket Energy StorageBattery storage · 125 MW · in study
- Holtsville 138kV Energy StorageBattery storage · 110 MW · in study
- Horseblock Energy StorageBattery storage · 100 MW · in study
- Holtsville Brookhaven Battery StorageBattery storage · 79.9 MW · in study
- Kce NY 29Battery storage · 79.0 MW · in study
- Daphne Energy StorageBattery storage · 75.0 MW · in study
- Clies 70MWBattery storage · 70.0 MW · in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem