United States βΊ Grid βΊ Interconnection queues βΊ Louisiana
SOLAR Β· MISOSolar project J2096, Terrebonne Parish County
Solar project J2096, Terrebonne Parish County is a 180 MW solar request withdrawn in the MISO interconnection queue, in Terrebonne Parish County, Louisiana, connecting to ENTERGY LOUISIANA.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2021 (completed)
- Withdrawn / abandonedNov 2021 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J2096
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ENTERGY LOUISIANA
- Connection point (POI)
- Schriever 230 kV Substation
- Location
- Terrebonne Parish County, Louisiana
- Technology
- Solar: 180 MW
- Total requested
- 180 MW
- Service type
- Energy only (ERIS)
- Study phase
- Study Phase: GIA In Process
- Queue status
- Withdrawn
- Entered queue
- 16 August 2021
- Proposed online date
- October 2024
- Withdrawn
- November 2021
Location
Marker shows the centre of Terrebonne Parish County; the queue data does not give exact sites.