United States βΊ Grid βΊ Interconnection queues βΊ Washington
SOLAR Β· WESTSolar project 58, Douglas County
Solar project 58, Douglas County is a 176 MW solar request withdrawn in the West interconnection queue, in Douglas County, Washington, connecting to Puget Sound Energy.
Queue statusWithdrawn / abandoned
- PlanningQueued Jan 2018 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 58
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- Puget Sound Energy
- Connection point (POI)
- Cascade-Rocky Reach 230 kV Line
- Location
- Douglas County, Washington
- Technology
- Solar: 176 MW
- Total requested
- 176 MW
- Service type
- NRIS and ERIS
- Study phase
- Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 22 January 2018
- Proposed online date
- December 2020
Location
Marker shows the centre of Douglas County; the queue data does not give exact sites.
Power plants in Washington Β· Transmission lines in Washington
Other requests in Douglas County
- Other project G1025, Douglas CountyOther Β· 1,274 MW Β· in study
- Battery storage project G0914, Douglas CountyBattery storage Β· 1,000 MW Β· in study
- Solar + storage project G0853, Douglas CountySolar + storage Β· 600 MW Β· in study
- Solar + storage project G0840, Douglas CountySolar + storage Β· 600 MW Β· in study
- Solar + storage project G0753, Douglas CountySolar + storage Β· 515 MW Β· in study
- Battery storage project G0915, Douglas CountyBattery storage Β· 500 MW Β· in study
- Battery storage project G0916, Douglas CountyBattery storage Β· 500 MW Β· in study
- Solar project G1035, Douglas CountySolar Β· 400 MW Β· in study
- Solar + storage project G0820, Douglas CountySolar + storage Β· 400 MW Β· in study
- Hydro project G0490, Douglas CountyHydro Β· 345 MW Β· in study
- Solar + storage project G0639, Douglas CountySolar + storage Β· 300 MW Β· in study
- Onshore wind project G0819, Douglas CountyOnshore wind Β· 200 MW Β· in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem