Gas project F05_W38

Gas project F05_W38 is a 1,200 MW gas request withdrawn in the PJM interconnection queue, connecting to APS.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2001 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
F05_W38
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
APS
Connection point (POI)
White Oak 500 kV
Location
Pennsylvania
Technology
Gas: 1,200 MW
Total requested
1,200 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study
Queue status
Withdrawn
Entered queue
29 January 2001
Proposed online date
March 2004

Location

No county location in the queue data.

Power plants in Pennsylvania Β· Transmission lines in Pennsylvania

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem