United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

SOLAR + STORAGE Β· MISO

Solar + storage project J2114, Tyler County

Solar + storage project J2114, Tyler County is a 140 MW solar + storage request withdrawn in the MISO interconnection queue, in Tyler County, Texas, connecting to ENTERGY TEXAS, INC..

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2021 (completed)
  2. Withdrawn / abandonedMar 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J2114
Grid region
MISO (Midcontinent)
Utility / transmission owner
ENTERGY TEXAS, INC.
Connection point (POI)
DOUCETTE to DEER 138 kV
Location
Tyler County, Texas
Technology
Solar: 140 MW Β· Battery
Total requested
140 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: GIA In Process; Post GIA Status: Not Started
Queue status
Withdrawn
Entered queue
1 December 2021
Proposed online date
August 2024
Withdrawn
March 2025

Location

Marker shows the centre of Tyler County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Tyler County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem