United States βΊ Grid βΊ Interconnection queues βΊ Illinois
ONSHORE WIND Β· MISOOnshore wind project J1066, Pike County
Onshore wind project J1066, Pike County is a 44.0 MW onshore wind request withdrawn in the MISO interconnection queue, in Pike County, Illinois, connecting to PRAIRIE POWER, INC..
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2018 (completed)
- Withdrawn / abandonedMay 2018 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J1066
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- PRAIRIE POWER, INC.
- Connection point (POI)
- El Dara Junction - Pittsfield 69 kV Line Tap
- Location
- Pike County, Illinois
- Technology
- Wind: 44.0 MW
- Total requested
- 44.0 MW
- Service type
- NRIS and ERIS
- Study phase
- Study Phase: GIA; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 12 March 2018
- Proposed online date
- July 2019
- Withdrawn
- May 2018
Location
Marker shows the centre of Pike County; the queue data does not give exact sites.
Other requests in Pike County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem