United States β€Ί Grid β€Ί Interconnection queues β€Ί Illinois

ONSHORE WIND Β· MISO

Onshore wind project J1066, Pike County

Onshore wind project J1066, Pike County is a 44.0 MW onshore wind request withdrawn in the MISO interconnection queue, in Pike County, Illinois, connecting to PRAIRIE POWER, INC..

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2018 (completed)
  2. Withdrawn / abandonedMay 2018 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J1066
Grid region
MISO (Midcontinent)
Utility / transmission owner
PRAIRIE POWER, INC.
Connection point (POI)
El Dara Junction - Pittsfield 69 kV Line Tap
Location
Pike County, Illinois
Technology
Wind: 44.0 MW
Total requested
44.0 MW
Service type
NRIS and ERIS
Study phase
Study Phase: GIA; Post GIA Status: Not Started
Queue status
Withdrawn
Entered queue
12 March 2018
Proposed online date
July 2019
Withdrawn
May 2018

Location

Marker shows the centre of Pike County; the queue data does not give exact sites.

Power plants in Illinois Β· Transmission lines in Illinois

Other requests in Pike County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem