United States βΊ Grid βΊ Interconnection queues βΊ Ohio
SOLAR Β· PJMSolar project AI2-438, Knox County
Solar project AI2-438, Knox County is a 150 MW solar request withdrawn in the PJM interconnection queue, in Knox County, Ohio, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2023 (completed)
- Withdrawn / abandonedJul 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AI2-438
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Apple Valley 138kV
- Location
- Knox County, Ohio
- Technology
- Solar: 150 MW
- Total requested
- 150 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 10 March 2023
- Proposed online date
- July 2027
- Withdrawn
- July 2025
Location
Marker shows the centre of Knox County; the queue data does not give exact sites.
Other requests in Knox County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem