Gas project 240, Utah County

Gas project 240, Utah County is a 636 MW gas request withdrawn in the West interconnection queue, in Utah County, Utah, connecting to PacifiCorp.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2008 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
240
Grid region
West (non-ISO utilities)
Utility / transmission owner
PacifiCorp
Connection point (POI)
System on Camp Williams/Hunter Emery Line near Lakeside Plant
Location
Utah County, Utah
Technology
Gas: 636 MW
Total requested
636 MW
Service type
Network resource (NRIS)
Study phase
WITHDRAWN BY CUSTOMER
Queue status
Withdrawn
Entered queue
24 September 2008
Proposed online date
June 2012

Location

Marker shows the centre of Utah County; the queue data does not give exact sites.

Power plants in Utah Β· Transmission lines in Utah

Other requests in Utah County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem