Onshore wind project G684, Cottonwood County

Onshore wind project G684, Cottonwood County is a 20.0 MW onshore wind request withdrawn in the MISO interconnection queue, in Cottonwood County, Minnesota.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2006 (completed)
  2. Withdrawn / abandonedJan 2007 (project stopped here)
  3. ConsentedJan 2007 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G684
Grid region
MISO (Midcontinent)
Connection point (POI)
Mt. Lake - Bat Lake 69 kV
Location
Cottonwood County, Minnesota
Technology
Wind: 20.0 MW
Total requested
20.0 MW
Queue status
Withdrawn
Entered queue
3 October 2006
Agreement signed
8 January 2007
Proposed online date
June 2004
Withdrawn
January 2007

Location

Marker shows the centre of Cottonwood County; the queue data does not give exact sites.

Power plants in Minnesota Β· Transmission lines in Minnesota

Other requests in Cottonwood County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem