United States β€Ί Grid β€Ί Interconnection queues β€Ί Washington

SOLAR + STORAGE Β· WEST

Solar + storage project G1030, Grant County

Solar + storage project G1030, Grant County is a 300 MW solar + storage request withdrawn in the West interconnection queue, in Grant County, Washington.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2023 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G1030
Grid region
West (non-ISO utilities)
Connection point (POI)
Rocky Ford-Grand Coulee No 1 230kV line
Location
Grant County, Washington
Technology
Solar: 200 MW Β· Battery: 100 MW
Total requested
300 MW
Service type
NRIS and ERIS
Queue status
Withdrawn
Entered queue
21 November 2023
Proposed online date
December 2028

Location

Marker shows the centre of Grant County; the queue data does not give exact sites.

Power plants in Washington Β· Transmission lines in Washington

Other requests in Grant County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem