United States βΊ Grid βΊ Interconnection queues βΊ Nevada
SOLAR + STORAGE Β· WESTSolar + storage project Company IS, Douglas County
Solar + storage project Company IS, Douglas County is a 100 MW solar + storage request withdrawn in the West interconnection queue, in Douglas County, Nevada, connecting to NV Energy.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2018 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- Company IS
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- NV Energy
- Location
- Douglas County, Nevada
- Technology
- Solar: 100 MW Β· Battery
- Total requested
- 100 MW
- Service type
- Network resource (NRIS)
- Queue status
- Withdrawn
- Entered queue
- 20 September 2018
- Proposed online date
- December 2022
Location
Marker shows the centre of Douglas County; the queue data does not give exact sites.
Other requests in Douglas County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem