United States β€Ί Grid β€Ί Interconnection queues β€Ί Oklahoma

BATTERY STORAGE Β· SPP

Battery storage project GEN-2023-SR2

Battery storage project GEN-2023-SR2 is a 85.0 MW battery storage request withdrawn in the SPP interconnection queue, connecting to OGE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2022 (completed)
  2. Withdrawn / abandonedOct 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. OperatingDec 2024 (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2023-SR2
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
OGE
Connection point (POI)
Minco 345 kV Substation
Location
Oklahoma
Technology
Battery: 85.0 MW
Total requested
85.0 MW
Service type
Energy only (ERIS)
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
30 November 2022
Proposed online date
December 2024
Came online
December 2024
Withdrawn
October 2023

Location

No county location in the queue data.

Power plants in Oklahoma Β· Transmission lines in Oklahoma

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem