United States βΊ Grid βΊ Interconnection queues βΊ Arkansas
BATTERY STORAGE Β· MISOBattery storage project J3001, Pulaski County
Battery storage project J3001, Pulaski County is a 50.0 MW battery storage request withdrawn in the MISO interconnection queue, in Pulaski County, Arkansas, connecting to ENTERGY ARKANSAS.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2022 (completed)
- Withdrawn / abandonedJul 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J3001
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ENTERGY ARKANSAS
- Connection point (POI)
- J2134 POI to White Bluff 115kV Line
- Location
- Pulaski County, Arkansas
- Technology
- Battery: 50.0 MW
- Total requested
- 50.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 15 September 2022
- Proposed online date
- September 2025
- Withdrawn
- July 2025
Location
Marker shows the centre of Pulaski County; the queue data does not give exact sites.
Other requests in Pulaski County
- Solar project J2350, Pulaski CountySolar Β· 116 MW Β· in study
- Gas project GEN-2000-010, Pulaski CountyGas Β· 340 MW Β· withdrawn
- Solar project J3195, Pulaski CountySolar Β· 200 MW Β· withdrawn
- Solar + storage project J3413, Pulaski CountySolar + storage Β· 150 MW Β· withdrawn
- Solar project J684, Pulaski CountySolar Β· 100 MW Β· withdrawn
- Battery storage project J2412, Pulaski CountyBattery storage Β· 100 MW Β· withdrawn
- Solar + storage project J2828, Pulaski CountySolar + storage Β· 50.0 MW Β· withdrawn
- Solar project J507, Pulaski CountySolar Β· 16.7 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem