United States βΊ Grid βΊ Interconnection queues βΊ Tennessee
ONSHORE WIND Β· SOUTHEASTOnshore wind project 262, Gibson County
Onshore wind project 262, Gibson County is a 198 MW onshore wind request withdrawn in the Southeast interconnection queue, in Gibson County, Tennessee, connecting to Tennessee Valley Authority.
Queue statusWithdrawn / abandoned
- PlanningQueued Dec 2014 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 262
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Tennessee Valley Authority
- Location
- Gibson County, Tennessee
- Technology
- Wind: 198 MW
- Total requested
- 198 MW
- Queue status
- Withdrawn
- Entered queue
- 16 December 2014
Location
Marker shows the centre of Gibson County; the queue data does not give exact sites.
Power plants in Tennessee Β· Transmission lines in Tennessee
Other requests in Gibson County
- Other project 151, Gibson CountyOther Β· 340 MW Β· withdrawn
- Other project 189, Gibson CountyOther Β· 340 MW Β· withdrawn
- Onshore wind project 537, Gibson CountyOnshore wind Β· 200 MW Β· withdrawn
- Onshore wind project 331, Gibson CountyOnshore wind Β· 196 MW Β· withdrawn
- Solar project 561, Dryer/Gibson CountySolar Β· 150 MW Β· withdrawn
- Solar + storage project 551, Gibson CountySolar + storage Β· 110 MW Β· withdrawn
- Solar project 503, Gibson CountySolar Β· 70.0 MW Β· withdrawn
- Solar project 613, Gibson CountySolar Β· 69.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem