United States βΊ Grid βΊ Interconnection queues βΊ Virginia
GAS Β· PJMGas project AH1-228, Fauquier County
Gas project AH1-228, Fauquier County is a 18.0 MW gas request withdrawn in the PJM interconnection queue, in Fauquier County, Virginia, connecting to Dominion.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2021 (completed)
- Withdrawn / abandonedDec 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AH1-228
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dominion
- Connection point (POI)
- Marsh Run 230kV
- Location
- Fauquier County, Virginia
- Technology
- Gas: 18.0 MW
- Total requested
- 18.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 8 September 2021
- Proposed online date
- October 2024
- Withdrawn
- December 2024
Location
Marker shows the centre of Fauquier County; the queue data does not give exact sites.
Other requests in Fauquier County
- Remington BESSBattery storage Β· 100 MW Β· agreement signed
- Battery storage project AH2-084, Fauquier CountyBattery storage Β· 125 MW Β· in study
- Solar project AI2-079, Fauquier CountySolar Β· 40.7 MW Β· in study
- Solar project AH1-345, Fauquier CountySolar Β· 14.0 MW Β· in study
- Solar project AB2-029, Fauquier CountySolar Β· 19.8 MW Β· built
- Remington GT4Gas Β· 15.0 MW Β· built
- Remington GT1Gas Β· 15.0 MW Β· built
- Remington GT3Gas Β· 15.0 MW Β· built
- Remington GT2Gas Β· 15.0 MW Β· built
- Gas project W1-074, Fauquier CountyGas Β· 610 MW Β· withdrawn
- Gas project X3-076, Fauquier CountyGas Β· 510 MW Β· withdrawn
- Fitch SolarSolar Β· 200 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem