SOLAR Β· SOUTHEASTSolar project 202, Chesterfield County
Solar project 202, Chesterfield County is a 75.0 MW solar request withdrawn in the Southeast interconnection queue, in Chesterfield County, South Carolina, connecting to Santee Cooper.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2023 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 202
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Santee Cooper
- Location
- Chesterfield County, South Carolina
- Technology
- Solar: 75.0 MW
- Total requested
- 75.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 1 June 2023
- Proposed online date
- June 2027
Location
Marker shows the centre of Chesterfield County; the queue data does not give exact sites.
Power plants in South Carolina Β· Transmission lines in South Carolina
Other requests in Chesterfield County
- Solar project 566488, Chesterfield CountySolar Β· 74.9 MW Β· under construction
- Solar project PP00003, Chesterfield CountySolar Β· 74.9 MW Β· under construction
- Solar project 962635, Chesterfield CountySolar Β· 80.0 MW Β· in study
- Solar project 977873, Chesterfield CountySolar Β· 74.9 MW Β· in study
- Solar project 961214, Chesterfield CountySolar Β· 48.0 MW Β· in study
- Other project PP00052, Chesterfield CountyOther Β· 48.0 MW Β· in study
- Solar project 63, Chesterfield CountySolar Β· 75.0 MW Β· built
- Solar project 956283, Chesterfield CountySolar Β· 110 MW Β· withdrawn
- Solar project 915761, Chesterfield CountySolar Β· 74.9 MW Β· withdrawn
- Solar + storage project 236, Chesterfield CountySolar + storage Β· 74.9 MW Β· withdrawn
- Solar project 956721, Chesterfield CountySolar Β· 74.9 MW Β· withdrawn
- Solar project 918047, Chesterfield CountySolar Β· 74.9 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem