BATTERY STORAGE Β· SPP

Battery storage project GEN-2022-081, Washington County

Battery storage project GEN-2022-081, Washington County is a 218 MW battery storage request withdrawn in the SPP interconnection queue, in Washington County, Kansas, connecting to SUNC.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2022 (completed)
  2. Withdrawn / abandonedMar 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2022-081
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
SUNC
Connection point (POI)
Clifton 115kV Substation
Location
Washington County, Kansas
Technology
Battery: 218 MW
Total requested
218 MW
Service type
NRIS and ERIS
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
22 September 2022
Proposed online date
November 2027
Withdrawn
March 2025

Location

Marker shows the centre of Washington County; the queue data does not give exact sites.

Power plants in Kansas Β· Transmission lines in Kansas

Other requests in Washington County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem