ONSHORE WIND Β· MISOOnshore wind project MPC01500, Pembina County
Onshore wind project MPC01500, Pembina County is a 200 MW onshore wind request withdrawn in the MISO interconnection queue, in Pembina County, North Dakota, connecting to Minnkota Power Cooperative.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2008 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- MPC01500
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- Minnkota Power Cooperative
- Connection point (POI)
- Drayton 230 kV Substation
- Location
- Pembina County, North Dakota
- Technology
- Wind: 200 MW
- Total requested
- 200 MW
- Service type
- Network resource (NRIS)
- Queue status
- Withdrawn
- Entered queue
- 11 July 2008
- Proposed online date
- December 2010
Location
Marker shows the centre of Pembina County; the queue data does not give exact sites.
Power plants in North Dakota Β· Transmission lines in North Dakota
Other requests in Pembina County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem