United States βΊ Grid βΊ Interconnection queues βΊ Missouri
ONSHORE WIND Β· MISOOnshore wind project J1185, Putnam County
Onshore wind project J1185, Putnam County is a 200 MW onshore wind request withdrawn in the MISO interconnection queue, in Putnam County, Missouri, connecting to Ameren Missouri.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2018 (completed)
- Withdrawn / abandonedApr 2019 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J1185
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- Ameren Missouri
- Connection point (POI)
- Adair - Appanoose 161 kV Line Tap
- Location
- Putnam County, Missouri
- Technology
- Wind: 200 MW
- Total requested
- 200 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 12 March 2018
- Proposed online date
- September 2020
- Withdrawn
- April 2019
Location
Marker shows the centre of Putnam County; the queue data does not give exact sites.