United States βΊ Grid βΊ Interconnection queues βΊ Kentucky
SOLAR Β· PJMSolar project AC1-138, Boone County
Solar project AC1-138, Boone County is a 2.5 MW solar request withdrawn in the PJM interconnection queue, in Boone County, Kentucky, connecting to DEOK.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2016 (completed)
- Withdrawn / abandonedNov 2016 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AC1-138
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- DEOK
- Connection point (POI)
- Bend Station 12kV
- Location
- Boone County, Kentucky
- Technology
- Solar: 2.5 MW
- Total requested
- 2.5 MW
- Service type
- Energy only (ERIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 28 October 2016
- Proposed online date
- December 2017
- Withdrawn
- November 2016
Location
Marker shows the centre of Boone County; the queue data does not give exact sites.
Other requests in Boone County
- Solar project AH1-239, Boone CountySolar Β· 80.0 MW Β· in study
- Solar project AH1-466, Boone CountySolar Β· 600 MW Β· withdrawn
- Battery storage project AH1-467, Boone CountyBattery storage Β· 300 MW Β· withdrawn
- Solar project AH1-240, Boone CountySolar Β· 200 MW Β· withdrawn
- Battery storage project AH1-428, Boone CountyBattery storage Β· 40.0 MW Β· withdrawn
- Solar project AC1-137, Boone CountySolar Β· 1.9 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem