United States βΊ Grid βΊ Interconnection queues βΊ Illinois
BATTERY STORAGE Β· PJMBattery storage project Y2-003
Battery storage project Y2-003 is a 0.6 MW battery storage request withdrawn in the PJM interconnection queue, connecting to ComEd.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2012 (completed)
- Withdrawn / abandonedMar 2016 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- Y2-003
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- ComEd
- Connection point (POI)
- Chicago Battery
- Location
- Illinois
- Technology
- Battery: 0.6 MW
- Total requested
- 0.6 MW
- Service type
- Energy only (ERIS)
- Study phase
- Interim/Interconnection Service Agreement: Wholesale Market Participation Agreement
- Queue status
- Withdrawn
- Entered queue
- 16 May 2012
- Proposed online date
- August 2014
- Withdrawn
- March 2016
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem