United States βΊ Grid βΊ Interconnection queues βΊ Oregon
BATTERY STORAGE Β· WESTBattery storage project 22-117, Clackamas County
Battery storage project 22-117, Clackamas County is a 400 MW battery storage request withdrawn in the West interconnection queue, in Clackamas County, Oregon, connecting to Portland General Electric.
Queue statusWithdrawn / abandoned
- PlanningQueued Dec 2022 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 22-117
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- Portland General Electric
- Connection point (POI)
- Carver Substation
- Location
- Clackamas County, Oregon
- Technology
- Battery: 400 MW
- Total requested
- 400 MW
- Service type
- Network resource (NRIS)
- Queue status
- Withdrawn
- Entered queue
- 9 December 2022
- Proposed online date
- December 2027
Location
Marker shows the centre of Clackamas County; the queue data does not give exact sites.
Other requests in Clackamas County
- Battery storage project 21-103, Clackamas CountyBattery storage Β· 200 MW Β· in study
- Gas project 07-027, Clackamas CountyGas Β· 200 MW Β· suspended
- Battery storage project 12-054, Clackamas CountyBattery storage Β· 100 MW Β· suspended
- Gas project 07-026, Clackamas CountyGas Β· 100 MW Β· suspended
- Battery storage project 24-250, Clackamas CountyBattery storage Β· 200 MW Β· withdrawn
- Battery storage project 24-253, Clackamas CountyBattery storage Β· 200 MW Β· withdrawn
- Battery storage project G0528, Clackamas CountyBattery storage Β· 150 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem