United States βΊ Grid βΊ Interconnection queues βΊ Oklahoma
ONSHORE WIND Β· SPPOnshore wind project GEN-2012-029, Kiowa County
Onshore wind project GEN-2012-029, Kiowa County is a 100 MW onshore wind request withdrawn in the SPP interconnection queue, in Kiowa County, Oklahoma, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2012 (completed)
- Withdrawn / abandonedMar 2013 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2012-029
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Tap Little Elk - Hobart 138kV
- Location
- Kiowa County, Oklahoma
- Technology
- Wind: 100 MW
- Total requested
- 100 MW
- Service type
- Energy only (ERIS)
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 28 September 2012
- Proposed online date
- December 2014
- Withdrawn
- March 2013
Location
Marker shows the centre of Kiowa County; the queue data does not give exact sites.
Other requests in Kiowa County
- Solar project GEN-2024-157, Kiowa CountySolar Β· 140 MW Β· in study
- Solar project GEN-2015-013, Kiowa CountySolar Β· 120 MW Β· built
- Solar project GEN-2017-036, Kiowa CountySolar Β· 100 MW Β· built
- Onshore wind project GEN-2014-062, Kiowa CountyOnshore wind Β· 200 MW Β· withdrawn
- Onshore wind project GEN-2024-133, Kiowa CountyOnshore wind Β· 196 MW Β· withdrawn
- Onshore wind project GEN-2009-066, Kiowa CountyOnshore wind Β· 102 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem