GAS Β· NYISOBay Energy Project
Bay Energy Project is a 79.9 MW gas request withdrawn in the NYISO interconnection queue, in Kings County, New York, connecting to CONED.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2002 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 124
- Grid region
- NYISO (New York)
- Utility / transmission owner
- CONED
- Developer
- Bay Energy, LLC
- Connection point (POI)
- Gowanus 138kV
- Location
- Kings County, New York
- Technology
- Gas: 79.9 MW
- Total requested
- 79.9 MW
- Queue status
- Withdrawn
- Entered queue
- 1 July 2002
Location
Marker shows the centre of Kings County; the queue data does not give exact sites.
Other requests in Kings County
- Bluepoint Wind 1Offshore wind Β· 1,310 MW Β· in study
- Empire Wind 1Offshore wind Β· 816 MW Β· in study
- NYC Energy LLC - Phase 2Battery storage Β· 220 MW Β· in study
- Battery Park StorageBattery storage Β· 190 MW Β· in study
- Gowanus Energy StorageBattery storage Β· 150 MW Β· in study
- NYC EnergyBattery storage Β· 79.9 MW Β· in study
- Bayonne Energy Center IIIBattery storage Β· 49.8 MW Β· in study
- Pouch Energy Storage SystemBattery storage Β· 47.1 MW Β· in study
- Blue Sky Interconnect 2Offshore wind Β· 2,620 MW Β· withdrawn
- Atlantic Shores Offshore Wind Bight 4Offshore wind Β· 2,100 MW Β· withdrawn
- Atlantic Shores Offshore Wind Bight 1Offshore wind Β· 2,100 MW Β· withdrawn
- OW Ocean Winds East 7Offshore wind Β· 1,600 MW Β· withdrawn