United States β€Ί Grid β€Ί Interconnection queues β€Ί Washington

GAS Β· WEST

250MW Snohomish

250MW Snohomish is a 250 MW gas request withdrawn in the West interconnection queue, in Snohomish County, Washington, connecting to FPL Energy Power Marketing Inc.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2001 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G18
Grid region
West (non-ISO utilities)
Utility / transmission owner
FPL Energy Power Marketing Inc
Developer
FPL Energy Power Marketing Inc
Connection point (POI)
Snohomish 115 kV Substation
Location
Snohomish County, Washington
Technology
Gas: 250 MW
Total requested
250 MW
Service type
Energy only (ERIS)
Queue status
Withdrawn
Entered queue
10 January 2001
Proposed online date
September 2002

Location

Marker shows the centre of Snohomish County; the queue data does not give exact sites.

Power plants in Washington Β· Transmission lines in Washington

Other requests in Snohomish County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem