United States β€Ί Grid β€Ί Interconnection queues β€Ί Pennsylvania

GAS Β· PJM

Unit 1

Unit 1 is a 30.0 MW gas request withdrawn in the PJM interconnection queue, in Dauphin County, Pennsylvania, connecting to AEC.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 1999 (completed)
  2. Withdrawn / abandonedJul 2000 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
A57
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
AEC
Connection point (POI)
Edgemoor
Location
Dauphin County, Pennsylvania
Technology
Gas: 30.0 MW
Total requested
30.0 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study
Queue status
Withdrawn
Entered queue
8 March 1999
Proposed online date
October 2001
Withdrawn
July 2000

Location

Marker shows the centre of Dauphin County; the queue data does not give exact sites.

Power plants in Pennsylvania Β· Transmission lines in Pennsylvania

Other requests in Dauphin County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem