United States β€Ί Grid β€Ί Interconnection queues β€Ί Missouri

ONSHORE WIND Β· SPP

Onshore wind project GEN-2006-014, Atchison County

Onshore wind project GEN-2006-014, Atchison County is a 300 MW onshore wind request withdrawn in the SPP interconnection queue, in Atchison County, Missouri, connecting to MIPU.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2006 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2006-014
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
MIPU
Connection point (POI)
Tap Maryville - Midway (Nodway Co) 161kV
Location
Atchison County, Missouri
Technology
Wind: 300 MW
Total requested
300 MW
Service type
Energy only (ERIS)
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
2 March 2006
Proposed online date
May 2008

Location

Marker shows the centre of Atchison County; the queue data does not give exact sites.

Power plants in Missouri Β· Transmission lines in Missouri

Other requests in Atchison County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem