United States β€Ί Grid β€Ί Interconnection queues β€Ί Colorado

SOLAR Β· WEST

Solar project BHCT-G12, Pueblo County

Solar project BHCT-G12, Pueblo County is a 60.0 MW solar request withdrawn in the West interconnection queue, in Pueblo County, Colorado, connecting to Black Hills Colorado Electric.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2014 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
BHCT-G12
Grid region
West (non-ISO utilities)
Utility / transmission owner
Black Hills Colorado Electric
Developer
Black Hills Electric Generation LLC
Connection point (POI)
Nyberg Substation 115 kV
Location
Pueblo County, Colorado
Technology
Solar: 60.0 MW
Total requested
60.0 MW
Service type
Energy only (ERIS)
Study phase
Withdrawn
Queue status
Withdrawn
Entered queue
28 February 2014
Proposed online date
June 2016

Location

Marker shows the centre of Pueblo County; the queue data does not give exact sites.

Power plants in Colorado Β· Transmission lines in Colorado

Other requests in Pueblo County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem